WIP Run & WIP Aging Charts is a Jira dashboard app that helps Scrum, Kanban, SAFe®, ITSM, and other teams monitor work in progress and maintain a stable and predictable workflow.
Track how long work items remain in their statuses or board columns, analyze how WIP changes over time, identify aging items and bottlenecks, monitor WIP limit breaches, and detect workload or capacity problems before they affect delivery.
The app helps you answer questions such as:
-
How much work is currently in progress?
-
How long has each work item remained in its current status or board column?
-
Which work items are taking longer than expected?
-
Is WIP increasing, decreasing or remaining stable?
-
Is the team staying within its WIP limits?
-
Where is work accumulating in the workflow?
-
Is the team taking on more work than it can complete?
Key features
Two complementary WIP perspectives
Use WIP Aging to inspect the age individual work items. Use WIP Run to understand how the overall volume of work in progress changes over time.
Multiple data sources
Create charts using data from:
-
Jira agile boards
-
Saved filters
-
JQL queries
-
Epics
-
Portfolio-level work items, such as initiatives or themes
This allows you to track WIP for a single team, multiple projects, a release, an epic or a broader delivery initiative.
Configurable WIP definition
Define which workflow statuses or board columns represent work in progress so that the calculations match your team’s workflow and working practices.
Flexible WIP measurement
Calculate WIP using:
-
Work item count
-
Story Points
-
Original Time Estimate
-
Other numerical custom fields available in Jira
Aging thresholds and percentiles
Add average, percentile or custom threshold lines to the WIP Aging Chart. Work items that exceed the configured threshold can be highlighted, making unusually old work easier to identify.
WIP limits and breach detection
Display minimum and maximum WIP limits in the WIP Run Chart and identify the intervals in which those limits were breached.
WIP trends and distribution
Display the total WIP and add a linear or polynomial trendline to determine whether work in progress is increasing or decreasing. You can also split WIP by a different fields to understand how work is distributed by status, work item type, assignee, priority, project or another relevant dimension.
Configurable calculations and display
Customize age calculations, time units, chart intervals, colors, labels, legends and other display options to match the reporting needs of your team.
Metrics and flow signals you can track
|
Metric or signal |
Gadget |
|---|---|
|
Current WIP |
WIP Aging |
|
WIP age |
WIP Aging |
|
Average WIP age |
WIP Aging |
|
Aging threshold breaches |
WIP Aging |
|
WIP by workflow stage |
WIP Aging |
|
WIP over time |
WIP Run |
|
Total WIP |
WIP Run |
|
WIP trend |
WIP Run |
|
WIP limit breaches |
WIP Run |
|
WIP distribution |
WIP Run |
|
Workflow stability |
WIP Run |
|
Potential capacity problems |
WIP Run |
|
Potential bottlenecks and stalled work |
Both gadgets |