Great Gadgets for Azure DevOps

How to measure time between two selected workflow states in Azure DevOps

:check_mark:

Measure time between two workflow states in Azure DevOps. Track weekly averages, spot handoff delays, and inspect work item durations with Great Gadgets.

Context: Your team wants to measure how long work takes to move between two selected states, such as In Progress and Testing, and understand whether that duration is changing over time.

Use the Cycle Time Trend widget in Great Gadgets for Azure DevOps to measure this duration and display its average over time.

Configure a time between two workflow states report:

  1. Add the Cycle Time Trend widget to your Azure DevOps dashboard. See How to use Great Gadgets

  2. On the configuration Data tab, select your team board or a shared query covering the work you want to analyze, including items that have since been completed.

  3. Under Cycle starts, select When the work item entered this state, then choose In Progress.

  4. Under Cycle ends, select When the work item entered this state, then choose In Testing.

  5. Select a date, intervals length and the number of intervals to be displayed. Leave Include the current (incomplete) interval unchecked.

Azure DevOps Cycle Time Trend settings measuring In Progress to In Testing in weekly intervals
  1. On the More Settings tab, choose the time unit (hours, minutes, or days) and select Average Time under Series to display. Optionally, enable a Linear or Polynomial trendline.

  2. Under Series to display, enable Average Time and Trendline, then select Linear.

  3. Enable Show the Overall Average Time, calculated as the average of the last 5 intervals, and enable Show data table.


Cycle Time Trend settings using hours, first state entries, the first cycle, and a Linear trendline
  1. Save and review the chart.

cycle-time-trend-chart-time-between-specific-statuses.png
  1. Open the widget’s Data tab to inspect the work items, cycle dates, and durations behind each interval.

data tab with Work item durations from In Progress to In Testing for a selected weekly interval

Interpret the chart

Each bar shows the average elapsed time from entering In Progress to entering In Testing for work items whose selected cycle ended during that week.

The weekly averages are 12, 18, 27, 21, and 24 hours. The 20.4 h summary is the average of these five weekly values.

The orange Linear trendline slopes upward, showing that the measured duration increased overall across the displayed period. The highest weekly average is 27 hours for 10–16 May.

Measurement ends when an item enters In Testing. Time spent in that state after entry is outside this measurement.

Practical example

For example, if the weekly average rises from 18 to 27 hours, open the widget’s Data tab for the affected interval and inspect the individual work item durations. Check the items’ histories and comments for review delays, environment issues, or handoffs before they entered In Testing. Agree on a next step with the team.

And that’s it! You can now measure time between two workflow states and track how it changes over time on your Azure DevOps dashboard.

For all configuration options, see the Cycle Time Trend widget documentation.

📈

Haven’t tried Great Gadgets for Azure DevOps yet?

Start your 30-day free trial

If you need help or have any questions, feel free to email us anytime at support@stonikbyte.com or open a support ticket.

Last updated: