How to track work in progress (WIP) trends over time in Azure DevOps

:check_mark:

Track work in progress over time in Azure DevOps. Use the WIP Run Chart to spot growing WIP, monitor limits, and investigate unfinished work.

Context: Your team wants to see whether work in progress is accumulating over time and identify periods when too much work is underway.

Work in progress (WIP) is work that has started but has not yet finished.

Use the WIP Run Chart widget in Great Gadgets for Azure DevOps to track WIP over time directly on your Azure DevOps dashboard.

In this example, WIP is measured in story points: each daily value adds up the story-point estimates of the work items counted as in progress that day. But it can also be measured using Work Item Count, Time Estimates or any numerical custom field.

Configure the WIP Run Chart

  1. Add the WIP Run Chart widget to your Azure DevOps dashboard. See How to use Great Gadgets.

  2. On the configuration Data tab, select your team board or a shared query covering the work you want to analyze. Include completed items in the query so they can contribute to historical WIP before completion.

  3. Under Time range, select A number of days back and enter 30. Set Intervals of to 1 day.

  4. Set Calculate by to Story Points.

  5. Under “WIP” means, select Work item state has category “In Progress”. This defines which work items contribute to WIP on each day.

	WIP Run Chart settings for daily story-point totals and In Progress-category work items
  1. On More Settings, under Series to display, enable Total WIP. Enable Trendline and select Linear to show the overall direction.

  2. Optionally, enable Maximum and minimum WIP limits and enter your team’s agreed limits. To compare WIP across categories, enable Split WIP by and select a field such as Priority.

WIP Run Chart settings with Total WIP, a Linear trendline, and maximum 100 and minimum 40 story-point limits
  1. Save and review the chart.

work-in-progress-wip-over-time-in-azure-devops.png

Interpret the chart

The Total WIP line shows the total story points of work items counted as in progress on each day. The orange Linear trendline slopes slightly upward, showing an overall increase across the displayed period.

The dashed lines mark the configured maximum of 100 story points and minimum of 40. The chart shows five daily values outside these limits: three above 100 and two below 40.

The latest WIP is 79 story points, within the configured limits, and the highest is 114. Review periods above the maximum to understand what was underway. For values below the minimum, check whether they reflect completed work, a shortage of ready work, or other team circumstances.

If WIP stays within the configured limits over time and the trendline remains roughly flat, this suggests a stable workload. Combined with consistent throughput and cycle times, it can indicate that the team is maintaining a sustainable delivery pace.

Practical example

For example, if WIP reaches 114 story points while your team’s agreed maximum is 100, inspect the work that was in progress during that period for blockers, dependencies, or review delays. Agree on which items to finish or unblock before starting more work.

And that’s it! You can now track WIP over time and spot periods when unfinished work is accumulating on your Azure DevOps dashboard.

For all configuration options, see the WIP Run Chart widget documentation.

📈